On resurfacing projects where surface treatment is specified but the local government desires plant mix, the
additional cost will be borne by the local government. If surface treatment is specified due to structural deficiencies,
the plant mix substitution will be made at a minimum of 165 Lbs. per SY. If surface treatment is specified due to
surface deficiencies, i.e., missing stone, the plant mix substitution will be made using a minimum of 125 Lbs. per SY.
On a newly constructed base with surface treatment for pavement, and the local government desires plant mix,
the substitution may be made by substituting a minimum of 220 Lbs. per SY of 12.5 mm asphaltic concrete. Additional
thickness may be required in some instances. This will be left to the judgement of the Engineer. The additional cost is
to be borne by the local government.
Where plant mix is not justifiable and surface treatment is to be recommended, the type and stone size should be
shown as appropriate for the job need.