Table 4.8. Vertical Profile Clearance Based on High Water |
Facility |
Designer’s First Priority
Roadway Base or
Bridge Low Chord Clearance |
Designer Must Check
Shoulder Break Point Clearance or
Bridge Low Chord Clearance |
Required Clearance |
Design Flood Frequency |
Required
Clearance |
Design Flood Frequency |
Interstate |
2-ft. |
50-year |
1-ft. below shoulder break point |
100-year |
Hurricane Evacuation Routes |
2-ft. |
50-year |
1-ft. below shoulder break point |
100-year |
Roads Designed as State Routes |
2-ft. |
50-year |
1-ft. below shoulder break point |
100-year |
Roads Not Designed as State Routes |
|
|
|
|
ADT: 0 – 99 |
2-ft. |
5-year |
1-ft. below shoulder break point |
10-year |
ADT: 100 – 399 |
2-ft. |
10-year |
1-ft. below shoulder break point |
25-year |
ADT: 400 – 1,499 |
2-ft. |
25-year |
1-ft. below shoulder break point |
50-year |
ADT: 1,500 or more |
2-ft. |
50-year |
1-ft. below shoulder break point |
100-year |
Driveways |
2-ft. |
25-year |
Shoulder break point not overtopped |
50-year |
Temporary Detours |
2-ft. |
10-year |
Shoulder break point not overtopped |
25-year |
Permanent Bridges |
2-ft. |
50-year |
1-ft. low-chord clearance |
100-year |
Temporary Bridges |
|
|
|
|
Local Road with ADT < 400 |
2-ft. |
2-year |
Low-chord not overtopped |
5-year |
All Other Roads |
2-ft. |
10-year |
Low-chord not overtopped |
25-year |