GDOT, Keeping Georgia on the Move Georgia Department of Transportation
How to Use This Manual
Table of Contents | Download Manual
Glossaries | References | Implementation

GDOT Design Policy Manual

Chapter 3 - Design Controls

3.4. Traffic Engineering, Capacity, and Level of Service

All portions of roadways that are part of major construction or reconstruction shall be designed to accommodate, at a minimum, 20-year forecasted traffic volumes. The design year for the 20-year traffic volumes shall be forecasted from the estimated construction completion date.

Refer to Chapter 13, Traffic Analysis and Design, of this Manual for further discussion on the traffic engineering and analysis. 

If a project is not new roadway construction or reconstruction, refer to Chapter 11, Other Project Types for guidance relating to other project types.

< Prev     Top     Next >


GDOT Design Policy Manual ver. 2.0  Revised 11/17/2008

logo Home | Table of Contents | Resources | Contact | ©2007 GDOT