Pre-Award Schedules and Selections
| Debriefings will be offered upon request after the contracts
have been awarded. |
Special Notice
| For the list of the consultants selected and projects assigned
to them for Turnkey No. 4, click here Turnkey
4 |
| For the list of the consultants selected and projects assigned
to them for Turnkey No. 3 contracts click here.Turnkey
No. 3 |
| For the list of the consultants selected and projects assigned
to them for the 20 Turnkey No. 2 contracts click here.Turnkey
No. 2 |
| For the list of the consultants selected and projects assigned
to them for the 20 Turnkey contracts click here.
Turnkey |
For Approved Consultant list click here. Acquisition
List, Pre-Acquistion
List, Pre-Row
Plans List, Right
of Way Scope of Services .
| RFQ-484-051707 |
| Description |
Countywide Studies |
| Project No. |
SPR00-000-00(971) |
| P.I. No. |
P.I. No. 0007971 |
| Firm (s): |
HNTB, Jordan Jones & Goulding and Reynolds, Smith &
Hills, Inc. |
| RFQ-484-051507 |
| Description |
Construction Engineering & Inspection - District 4 |
| Consultant |
Wilbur Smith Associates, Inc. |
| RFQ-484-051007 |
| Description |
Design Build Projects |
| Project No. |
CSNHS-0008-00(274) |
| P.I. No. |
P.I. No. 0008274 |
| Firm (s): |
E.R. Snell Contractor, Inc., C.W. Matthews Contracting Company,
Inc., and Pittman Construction Company |
| RFQ-484-050707 |
| Description |
Statewide Intelligent Transportation Systems (ITS) Design |
| Consultant: |
Gresham Smith and Partners |
| RFQ-484-042607 |
| Description |
Statewide Safety Design |
| Consultant: |
Gresham Smith and Partners |
| RFQ-484-042507 |
| Description |
Statewide Traffic Signal Upgrade Design |
| Project No. |
PESTP-0186-01(011), CSSTP-0006-00(900), CSSTP-0006-00(901) |
| P.I. No. |
720970, 0006900, 0006901 |
| Consultant: |
Wolverton & Associates and Street Smarts |
| RFQ-484-041707 |
| Description |
Multiple Projects SR92 |
| Consultant: |
Washington Group International, Inc. |
| RFQ-484-041607 |
| Description |
Metro Atlanta Arterial Signal Timing FY 2006 |
| Project No. |
CSCMQ000600741 |
| P.I. No. |
P.I. No. 006741 |
| Firm (s): |
URS, Wolverton & Associates, Kimley-Horn & Assoicates,
GCA, Transcore, and Carter Burgess |
| RFQ-484-041307 |
| Description |
CEI-South |
| Consultant: |
Volkert & Associates, Inc. |
| RFQ-484-041207 |
| Description |
CEI-North |
| Consultant: |
PBS&J |
| RFQ-484-041007 |
| Description |
Widening of Vineville Avenue/State Route 19 from State Route
247/Pio Nono to Forest Hill Road |
| Project No. |
PEMLP001900039 |
| P.I. No. |
363500 |
| Consultant: |
Kimley-Horn and Associates, Inc. |
FY 07 CAP No. 2 - RFQ-484-040907 |
| CT. # |
Firm |
P.I. No. |
Proj. No. |
Project Description |
1
|
The LPA Group, Inc. |
0007021 |
PEBRG-0007-00(030) |
Bridge Consultant Design Contract |
| 0007030 |
CSBRG-0007-00(030) |
Bridge Consultant Design Contract |
2
|
PB Americas, Inc. |
121385 |
PEBRF-0002-07(019) |
Bridge Consultant Design Contract |
| 0007047 |
PEBRG-0007-00(047) |
Bridge Consultant Design Contract |
| 0007058 |
PEBRG-0007-00(058) |
Bridge Consultant Design Contract |
3
|
Kimley-Horn & Associates |
0007392 |
PEBRG-0007-00(392) |
Bridge Consultant Design Contract |
| 0007393 |
PEBRG-0007-00(393) |
Bridge Consultant Design Contract |
| 0007394 |
PEBRG-0007-00(394) |
Bridge Consultant Design Contract |
| 0007395 |
PEBRG-0007-00(395) |
Bridge Consultant Design Contract |
| 0007886 |
PEBRG-0007-00(886) |
Bridge Consultant Design Contract |
4 |
Arcadis U.S., Inc. |
0007060 |
PEBRG-0007-00(060) |
Bridge Consultant Design Contract |
5 |
J.B. Trimble |
0002225 |
STP-0002-00(225) |
Bridge Consultant Design Contract |
| 0007024 |
CSBRG-0007-00(024) |
Bridge Consultant Design Contract |
6 |
PBS&J |
0007051 |
PEBRG-0007-00(051) |
Bridge Consultant Design Contract |
7
|
Parsons Transportation Group, Inc. |
0007025 |
PEBRG-0007-00(025) |
Bridge Consultant Design Contract |
| 0007160 |
PEBRG-0007-00(160) |
Bridge Consultant Design Contract |
| 0007027 |
PEBRG-0007-00(027) |
Bridge Consultant Design Contract |
8
|
Heath & Lineback Engineers, Inc. |
0007031 |
PEBRG-0007-00(031) |
Bridge Consultant Design Contract |
| 0007141 |
PEBRG-0007-00(174) |
Bridge Consultant Design Contract |
| RFQ-484-031607 |
| Description |
Statewide On-Call Pavement Consultting Services |
| Consultant: |
United Consulting Services, Inc. |
| RFQ-484-031507 |
| Description |
Bridge Maintenance Load Rating |
| Project No. |
PEBRONBIS00007 |
| P.I. No. |
0006950 |
| Consultant: |
PBS&J |
| RFQ-484-031407 |
| Description |
Bridge Maintenance Engineer Services - Bridge Inspection |
| Consultant: |
Kisinger Campo & Associates, Corp. and Volkert & Associates,
Inc. |
| RFP-484-022607 |
| Description |
Southwest Georgia Interstate Study |
| Consultant: |
PBS&J |
| RFQ-484-101106a |
| Description |
Statewide Task Order Service Contract |
| Consultant: |
LCW Engineering, Inc. |
| RFQ-484-101006 |
| Description |
Statewide Task Order Service Contract |
| Consultant: |
URS Corporation |
| RFP-484-110106 |
| Description |
Project Prioritization Process |
| Project No. |
SPR00-0008-00(381) |
| P.I. No. |
0008381 |
| Consultant: |
Cambridge Systematics, Inc. |
| RFQ-484-103106 |
| Description |
CEI - District 6 |
| Consultant: |
MACTEC Engineering and Consulting, Inc. |
| RFP-484-103006 |
| Description |
Task Order Services Contract for Consultant Services Transportation
Management Center Support |
| Consultant: |
Serco, Inc. |
| RFQ-484-101106 |
| Description |
Aviation Programs Project Management (Statewide) |
| Project No. |
APENG07-AAP-22 |
| Consultant: |
Wilbur Smith Associates |
| RFQ-484-092806 |
| Description |
Cultural and Natural Assessments for Borrow/Stockpile/Disposal
Sites (Statewide) |
| Consultant: |
Edwards-Pitman Environmental, Inc. |
| RFQ-484-092906 |
| Description |
HOV Lanes |
| Project No. |
CSSTP-0006-00(439) |
| P.I. No. |
0006439 |
| Consultant: |
Gresham Smith & Partners, Inc. |
| RFQ-484-092906 |
| Description |
HOV Lanes |
| Project No. |
MSL-004-00(869) |
| P.I. No. |
0004869 |
| Consultant: |
PBS&J |
| RFQ-484-062306 |
| Description |
Longe Range Project Cost Estimates |
| Project No. |
SPR00-0008(293) |
| P.I. No. |
0008293 |
| Consultant: |
Wilbur Smith Associates, Inc. |
| RFQ-484-061606 |
| Description |
Construction Engineering and Inspection Metro Atlanta |
| Consultant: |
Qore Property Sciences |
| RFQ-484-060806 |
| Description |
Value Engineering |
| Consultant: |
Lewis & Zimmerman Associates, Inc, MACTEC Engineering & Consulting,
PBS&J |
| RFQ-484-060606 |
| Description |
Completion of History Mitigation |
| Project No. |
BRM-9000(31) |
| P.I. No. |
752850 |
| Consultant: |
New South Associates |
| RFQ-484-050306 |
| Description |
Completion of a Tier I Environmental Statement for a High-Speed
Ground Transportation in the Atlanta-Chattanooga Corridor |
| Project No. |
HPP-00MS (339) |
| P.I. No. |
860110 |
| Consultant: |
Earth Tech, Inc. |
| RFQ-484-051006 |
| Description |
Geotechnical Engineering Services |
| Project No. |
MSL-003-00(225) |
| P.I. No. |
000225 |
| Consultant: |
Nova Engineering & Environment, Inc. |
| RFQ-484-030306 |
| Description |
CEI West Thomaston |
| Consultant: |
Volkert & Associates, Inc. |
| RFQ-484-030206 |
| Description |
CEI East Thomaston |
| Consultant: |
Moreland Altobelli Associates, Inc. |
| RFQ-484-022206 |
| Description |
CEI District 1 |
| Consultant: |
KCI Technologies, In. |
| RFQ-484-020206 |
| Description |
Task Order Services Contract for NEPA |
| Consultant: |
PBS&J, Inc. |
| RFQ-484-013006 |
| Description |
Task Order for Lighting |
| Consultant: |
Atlanta Consulting Engineers, Inc. |
| RFQ-484-111505 |
| Project: |
CSSTP-0006-00(405), (406), (407) |
| P.I. No. |
0006405, 0006406, 0006407 |
| Description |
Statewide Truck Lanes Study |
| Consultant: |
ITERIS, Inc. |
| RFQ-484-111005 |
| Description |
Design Services for a New Interchange at I-75 and US 411
Connector |
| Project No. |
PEEDS-055-00-005 |
| P.I. No. |
661950 |
| Consultant: |
J.B. Trimble, Inc. |
| RFP-484-110405 |
| Project: |
SPR00-0007-00(524) |
| P.I. No. |
0007524 |
| Description |
Statewide Truck Lanes Study |
| Consultant: |
HNTB |
| RFP-484-110205 |
| Project: |
PESTP000200917 |
| P.I. No. |
0002917 |
| Description |
Transportation Controller Deployment Program Manager |
| Consultant: |
Iteris, Inc. |
| RFP-484-102105 |
| Project: |
PESTP000200917 |
| Description |
Statewide Task Order Services |
| Consultant: |
Parsons, Jordan, Jones & Goulding, Inc & PBS&J |
| RFQ-484-100605 |
| Project: |
STP-0002-00(903) Dekalb |
| P.I. No. |
0002903 |
| Description |
Sidewalk Improvements |
| Consultant: |
Arcadis G&M, Inc. |
| RFQ-484-093005 |
| Description |
CR 868/(Old US 41) from SR 7/North Valdosta Road to SR 122
and CR 868 Old US 41 at Franks Creek Trib App 1.5 miles South Hahira |
| Project No. |
PESTP000101055 and PEBHF000101057 |
| P.I. No. |
431480 and 431485 |
| Consultant: |
LAI Engineering |
| RFQ-484-092305 |
| Project: |
MSL-0002-00-(982) |
| P.I. No. |
0002982 |
| Description |
Project Review Consultant Services |
| Consultant: |
Moreland Altobelli |
| RFQ-484-092005 |
| Project: |
APENG06-AAP-21 |
| Description |
Professional Services for Aviation Programs Project Management |
| Consultant: |
Wilbur Smith Associates |
| RFP-484-091505 |
| Project: |
CM771200(950) |
| P.I. No. |
771295 |
| Description |
ITS Maintenance Program Manager |
| Consultant: |
Parsons Brinckerhoff Farradyne |
| RFQ-484-011305 |
| Description |
SR 961/Old Alabama Road from Holcomb Bridge Road and Old
Alabama Road from Jones Bridge Road to SR 141/Medlock Bridge Road in Fulton
County |
| Project No. |
PESTP940800003 and PEMAS286800004 |
| P.I. No. |
751650 and 752660 |
| Consultant: |
Mulkey, Inc. |
| RFQ-484-011305 |
| Description |
SR 156 at College Street in Calhoun |
| Project No. |
PESTP000000308 |
| P.I. No. |
0000308 |
| Consultant: |
Arcadis & G&M, Inc. |
| RFQ-484-011305 |
| Description |
SR 53 from SR 515/APD to CR 243/Industrial Boulevard in
Pickens County |
| Project No. |
PESTP006502013 |
| P.I. No. |
621490 |
| Consultant: |
CH2M Hill, Inc. |
| RFQ-484-041505 |
| Description |
Design Services for HOV Lanes & Interchanges along I-85 |
| Project No. |
MSL-0003-00 (612) |
| P.I. No. |
0003162 |
| Consultant: |
Parsons Brinckerhoff Quade & Douglas, Inc. |
| RFP-484-090605 |
| Project: |
SPR-0007197 |
| P.I. No. |
0007197 |
| Description |
Professional Services for IJR/IMR & Traffic Analysis |
| Consultant: |
Day Wilburn & Associates, Inc. and HNTB |
| RFP-484-090505 |
| Project: |
SPR00-0007-00-197 |
| P.I. No. |
0007197 |
| Description |
State Transportation Improvement Program (STIP) Project |
| Consultant: |
Sycamore Consulting, Inc. |
| RFQ-484-082505 |
| Description |
Statewide Safety Design Contract |
| Consultant: |
Arcadis G&M, Inc. |
| RFP-484-072205 |
| Project: |
LABPE200300000 |
| Description |
Drilling Serivces |
| Consultant: |
Ranger Consulting, Inc. |
| RFP-484-072105 |
| Project: |
EDS-27(174) |
| P.I. No |
422235 |
| Description |
Archaeological Mitigation of National Register Eligible Sites |
| Consultant: |
New South Associates |
| RFQ-484-071505 |
| Project: |
PENHS000000764 |
| P.I. No. |
0000764 |
| Description |
I-75 from SR 37 to CR 246/Kinard Bridge Road - Phase 2 (Interchanges) |
| Consultant: |
Gresham, Smith & Partners |
| RFQ-484-071505 |
| Project: |
PEFR000750203 and PESTPOOMS00007 |
| P.I. No. |
610780, 662510 |
| Description |
I-75 at Union Grove Road Relocation and South Calhoun Bypass from SR53
and CR 13 to SR 53 to CR 64 |
| Consultant: |
Greenhorne & O'Mara, Inc. |
| RFQ-484-071505 |
| Project: |
PESTP000700217 |
| P.I. No |
0007217 |
| Description |
Social Circle Bypass from East Hightower Trail to SR11 |
| Consultant: |
Reynolds, Smith, and Hills, Inc. |
| RFQ-484-071505 |
| Project: |
PESTP001201081 |
| P.I. No |
122015 |
| Description |
SR 306 from SR 400 to East of SR 369 & Bridge at Baldridge Creek |
| Consultant: |
Florence & Hutcheson, Inc. |
| To schedule a debriefing for the following: RFQ-484-062405 e-mail Ms.
Deniece Dean January 26, 2006 - January 31, 2006. |
| RFQ-484-062405 |
| Project: |
NHS-001-00(758) and CSMSL-0006-00(428) |
| P.I. No |
0001758 and 0006428 |
| Description |
I-285 Mega Project |
| Consultant: |
Arcadis Geraghty & Miller, Inc. |
| To schedule a debriefing for the following: RFQ-484-060205 e-mail Ms.
Deniece Dean January 25, 2006 - January 30, 2006. |
| RFQ-484-060205 |
| Project No. |
EDS-0001-00(629) & EDS-545-(33) & MSL-0003-00(827) |
| P.I. No. |
0001629 & 0003827 & 522400 |
| Description |
CEI - North Jessup - Construction engineering and inspection
on construction projects assigned to the Baxley, Glennveille, Savanna
ahd Statesboror Area Offices |
| Consultant: |
EMC Engineering |
| To schedule a debriefing for the following: RFQ 484-053105, e-mail Ms.
Deniece Dean January 25, 2006 - January 30, 2006. |
| RFQ-484-053105 |
| Project No. |
EDS-0001-00(629) & MSL-0003-00(827) |
| P. I. No. |
0001629 & 0003827 |
| Description |
CEI - South Jessup - Construction engineering and inspection
on construction projects assigned to the Brunswick and Waycross Area Offices. |
| Consultant: |
Moreland Altobelli Associates, Inc. |
| RFP-484-051705 |
| Project: |
BHF-151-1 (6) & BRST-151-1 (7) (Gordon County) |
| Description |
SR 74 from S.E. 85 Northwest to just South of Crosstown |
| Consultant: |
URS, Inc. |
| RFP-484-051605 |
| Project: |
SPR-007-00(342) (Troup County) |
| Description |
Planning Study in Troup County |
| Consultant: |
HNTB |
| RFQ-484-042205 |
| Project: |
STP-209-1(2) & BHF-209-1(3) Fayette County |
| Description |
SR 74 from S.E. 85 Northwest to just South Crosstown Road |
| Consultant: |
Mulkey Engineers |
| RFQ-484-041805 |
| Project: |
NHS-0001-00 (792) |
| PI Number: |
0001792 |
| Description |
Design Services for a New HOV Interchange 15th Street at I-75/I-85 |
| Consultant: |
Wilbur Smith & Associates |
| RFQ-484-041505 |
| Project: |
MSL-0003-00 (162) |
| PI Number: |
0003162 |
| Description |
Design Services for HOV Lanes and Interchanges along I-85 |
| Consultant: |
Parsons Brinckerhoff Quade & Douglas, Inc. |
| RFQ-484-041905 |
| Project: |
MSL-0003-00 (167) |
| PI Number: |
0003167 |
| Description |
Design Services for HOV Lanes and Interchanges along I-75 |
| Consultant: |
Parsons |
| RFQ-484-041905 |
| Project: |
MSL-0003-00 (436) |
| PI Number: |
0003436 |
| Description |
Design Services for HOV Lanes and Interchanges along I-75 |
| Consultant: |
Parsons |
| RFQ-484-031105 |
| Description |
Design of Traffic Signal Upgrade Projects |
| Consultant: |
Street Smarts and Qk4 |
| RFQ-484-030405 |
| Project: |
Statewide Contract |
| PI Number: |
N/A |
| Description |
Stormwater System Assessments |
| Consultant: |
The TBE Group, Inc. and Arcadis |
| RFQ-484-020205 |
| Project: |
NH-520-1 (17) P.I. No. 210700 |
| PI Number: |
210700 |
| Description |
Widening of I-520 (Bobby Jones Expressway) |
| Consultant: |
Heath & Lineback Engineers, Inc. |
| RFQ-484-013105 |
| Project: |
CSSTP-0001-00 (896) |
| PI Number: |
0001896 |
| Description |
Engineering Analysis and Plan Development for Highway/Railroad Crossings |
| Consultant: |
Moreland Altobelli Associates, Inc. |
| RFP-484-012105 |
| Description |
Chatman County Interstate Need Analysis and Prioritization Plan |
| Consultant: |
Jordan, Jones & Goulding |
| To schedule a debriefing for the following: RFP-484-012005 e-mail Ms.
Deniece Dean January 26, 2006 - January 31, 2006 |
| RFP-484-012005 |
| Project: |
SPR00-0007-00 (237) |
| PI Number: |
0007237 |
| Description |
Corridor Studies |
| Consultant: |
Arcadis |
RFQ-484-010705
Bridge Structural Rehabilitation |
| PI Number |
Description |
Consultant |
| M003044 |
NHS-M003-00 (044) |
PBS & J |
| M003054 |
NHS-M003-00 (054) |
| M003071 |
STP-M003-00 (071) |
| M003072 |
NHS-M003-00 (072) |
| M003076 |
STP-M003-00 (076) |
| M003077 |
NHS-M003-00 (077) |
| M003079 |
NHS-M003-00 (079) |
| M003080 |
STP-M003-00 (080) |
| M003081 |
STP-M003-00 (081) |
| M003082 |
STP-M003-00 (082) |
2004 Preawards
Return to Consultant Design
Updated 02/07/07
Updated September 07, 2007. 06:18
© 2003-2007 Georgia Department of Transportation
|