Informational DocumentsNote: The documents contained on this page are for information only. Every attempt is made to keep them current. |
Document |
Date |
Download |
| Cost Plus Fixed Fee | 9-25-07 | |
| Indefinite Delivery/Indefinite Quantity | 9-25-07 | |
| Main Cost Proposal | 7-21-07 | |
| Cost Proposal (Geotechnical only) | 3-29-07 | |
| Cost Proposal Labor Rates | 3-29-07 | |
| Consultant Procurement Manual | 9-29-06 | |
| Novation Contract (Sample) | 9-29-06 |
| Document | Date | Download |
| Bridge Requirements | 7-9-1999 | Attachment 6.pdf |
| Database Deliverables | 10-5-2005 | Attachment 9.pdf |
| Location Report | 7-23-2001 | Attachment 8-3.pdf |
| Location Study Requirements | 7-23-2001 | Attachment 8-1.pdf |
| Practical Alternative Report | 7-23-2001 | Attachment 8-2.pdf |
| Preliminary Construction Cost Estimate pg 1-2 | 10-5-2005 | Attachment 3 Pages 1-2.pdf |
| Preliminary Construction Cost Estimate pg 3-7 | 10-5-2005 | Attachment 3 Pages 3-7.xls |
| Preliminary Construction Cost Estimate pg 8-10 | 10-5-2005 | Attachment 3 Pages 8-10 |
| Right of Way Services | 7-10-2006 | Attachment 11.pdf |
| Std Specs for Lighting Plans | 3-16-2004 | Attachment 10.pdf |
| Std Specs for Rdwy Construction Plans | 10-5-2005 | Attachment 2. pdf |
| Subsurface Utility Engineering | 5-30-2005 | SUE Homepage |