|
|
Office of Bridge Design
Welcome to our home page. The Office of Bridge Design is a part of the Preconstruction Division of the DOT. Primarily our office works with roadway designers of Road Design, Urban Design, and the District offices to design the structures that they need on their projects. Though this typically consists of bridges, we also design walls and culverts and anything else that requires structural design.
Here's what we have to offer:
The Sidney Lanier Bridge and Covered Bridges websites are no longer maintained by this office but are still available. If you are looking for a phone number of someone in Bridge Design, please use this link.
All written correspondence to our office should be sent to:
Paul V. Liles, Jr., State Bridge Engineer
Georgia Department of Transportation
No. 2 Capitol Square, SW
Atlanta, GA 30334
Phone: (404)656-5280
Fax: (404)651-7076
| Preconstruction
| Environment/Location
| Right of Way |
| Road & Airport Design
| Urban Design | Consultant Design
Updated November 02, 2007. 11:15
© 2003-2007 Georgia Department of Transportation
|
|